Agency: Housing Authority of the County of Richland (HUD)
Location: Olney, Illinois
Project IL-96-2/Olney (Sunshine Village)
Remove and replace existing shingle roofing, accessories and flashings on the 2-story units. Replace the vinyl siding on the walls above the roofs.
State the amount to be added to the Base Bid for providing leaf guards on the existing gutters.
State the amount for the roof replacement at the Maintenance Building.
Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $ 50.00 for each set of documents so obtained, made payable to the Housing Authority of the County of Richland.
This project has a construction estimate of: under $160,000.00
Agency: Housing and Urban Development (HUD)
Location: Golconda and Eddyville, Illinois
IL-58-1/Golconda:
Construct Maintenance Building including utilities and parking. Install screen doors.
IL-58-1/Golconda, IL-58-4/Golconda, and IL-58-6/Eddyville:
Seal asphalt drive and parking areas. Install screen doors.
IL-58-5/Golconda:
Seal asphalt drive and parking areas. Install screen doors. Pave ditch to provide site drainage improvements.
IL-58-2, 58-4, and 58-5/Golconda and IL-58-6/Eddyville:
Provide deduct price to delete all asphalt sealing work from the Base Bid.
BY ALTERNATE BID NO. 2:
IL-58-2, 58-4, and 58-5/Golconda and IL-58-6/Eddyville:
Provide deduct price to delete all screen door replacement from the Base Bid.
Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents so obtained, made payable to the Housing Authority oof Pope County.
This project has a construction estimate of: under $580,000
Location: Carbondale and Elizabethtown, Illinois
PROJECT DESCRIPTION:
Carbondale Headquarters Building (D0900): Work includes replacement of roofing at designated roof areas, including flashing and accessories; clean & repoint brick veneer, repair damaged brick, replace lintels, repair granite panels.
Carbondale Equipment Storage Building A (East) (D0904): Work includes renovation of a part of existing building for installation of insulation and heating system. Work includes new lighting and gas service to the building.
Elizabethtown Equipment Storage Building (D0982): Work includes insulating exterior walls and roof of existing post-framed building, upgrade electrical service, installation of electric heating units, and replace exterior wall panels and trim.
Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $125.00 for each set of documents so obtained, made payable to the Eggemeyer Associates Architects, Inc.
This project has a construction estimate of: under $2,000,000.00
Agency: Housing and Urban Development (HUD)
Location: Murphysboro, Illinois
Remove exterior storm doors. Remove and replace windows, trim, exterior doors and frames, siding and trim, and abate ACM panels and lead-based paint containing materials. Install new 911 address numbers, exterior light fixtures, A/C sleeves, and replace hose bibbs.
Replace gutters, downspouts, and splash blocks at all buildings. Provide leaf guards at 2-story buildings.
Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $100.00 for each set of documents so obtained, made payable to the Housing Authority of the County of Jackson, Illinois
This project has a construction estimate of: under $1,000,000.00
Agency: Housing and Urban Development (HUD)
Location: Salem, Illinois
Replace sections of the concrete sidewalks noted on drawings. Remove concrete patio and existing concrete tower base outside the Community Room. Replace the existing sidewalk drains across the site with new. Replace the adjacent concrete sidewalk as required to install new drains and regrade the site for drainage. Replace the concrete stoops at the entrance doors and storage doors noted. Raise up to match the unit floor level for ADA compliance. The sidewalk connecting the stoops will be replaced along for access and reconfigured.
Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $50.00 for each set of documents so obtained, made payable to the Marion County Housing Authority.
This project has a construction estimate of: under $100,000.00