Current Projects

Housing Authority of the County of Williamson - Kitchen, Bath & Plumbing Upgrades, Phase 5

Agency: Housing and Urban Development (HUD)

Location: Herrin, IL and Johnston City, IL

BASE BID:

IL-50-6/Herrin - Site 'A' (North 17th Street and Adams Street):

Site improvements include replacing damaged/deteriorated walks and paving, regrading yard areas and placing new concrete to walks and paving, and adding paved areas for additional parking.  Site utilities include replacing site electrical feeders, transformers, etc. with underground primary and secondary service, including meter bases.

Work in dwelling units shall consist of abatement of all floor tile and mastic and all gypsum board wall and ceiling finishes.  New vinyl plank flooring, sheet vinyl flooring, and wood base trim.  Saw-cut, remove, and replace concrete floor slab for replacement of all under slab sanitary waste piping.  Replace interior doors, frames and hardware, replace shelving, replace all light fixtures and wiring devices.  Replace existing electrical load centers and service wires back to meter base.  Rewire units.  Remove existing boilers including fin tube heaters, covers, flues, etc.  Install new electric baseboard heaters throughout.  Remove and replace water heaters.  Remove and replace all domestic water supply, waste, and vent piping.  Insulate exterior walls and attics.  Install new gypsum board on walls and ceilings.  Paint all units.

Bathroom work includes removing and replacing gypsum board wall finishes.  Replace water closets, wood chair rails, toilet accessories, medicine cabinets, light fixtures, exhaust fans, receptacles, and switches.  Replace tubs with showers.  Replace existing lavatories with vanity cabinets and tops.

Kitchen work includes removing and replacing existing appliances, kitchen cabinets, countertops, sinks, range hoods, and grease shields.  Install new HPDL wall finish.

Convert Unit 421 to meet accessibility codes and standards.

IL-50-7/Johnston City - Site 'B' (North 15th Street and Adams Street):

Work in designated dwelling units shall consist of abatement of all floor tile and mastic and designated areas of gypsum board wall and ceiling finishes.  Remove existing flooring and base trim and replace with new vinyl composition tile and wood base trim.  Saw-cut, remove, and replace concrete floor slab for all under slab sanitary waste piping.  Replace interior doors, frames and hardware, replace shelving, replace all light fixtures and wiring devices.  Replace existing electrical load centers and service wires back to meter base.  Temporarily remove and reinstall existing boilers and water heaters as required for underslab plumbing work.  Remove and replace existing fin tube heater covers.  Paint all units.

Bathroom work includes removing and replacing gypsum board wall finishes.  Replace water closets, wood chair rails, toilet accessories, medicine cabinets, light fixtures, exhaust fans, receptacles, and switches.  Remove and replace existing tubs and surrounds.  Replace existing lavatories with vanity cabinets and tops.

Kitchen work includes removing and replacing existing appliances, kitchen cabinets, countertops, sinks, range hoods, and grease shields.  Install new HPDL wall finish.

BY ALTERNATE BID No. 1:

IL-50-6/Herrin:

Replace designated areas of existing parking.

BY ALTERNATE BID No. 2:

IL-50-7/Johnston City - Site 'B' (North 15th Street and Adams Street):

Work in designated dwelling units shall consist of abatement of all floor tile and mastic and designated areas of gypsum board wall and ceiling finishes.  Remove existing flooring and base trim and replace with new vinyl composition tile and wood base trim.  Saw-cut, remove, and replace concrete floor slab for all under slab sanitary waste piping.  Replace interior doors, frames and hardware, replace shelving, replace all light fixtures and wiring devices.  Replace existing electrical load centers and service wires back to meter base.  Temporarily remove and reinstall existing boilers and water heaters as required for underslab plumbing work.  Remove and replace existing fin tube heater covers.  Paint all units.

Bathroom work includes removing and replacing gypsum board wall finishes.  Replace water closets, wood chair rails, toilet accessories, medicine cabinets, light fixtures, exhaust fans, receptacles, and switches.  Remove and replace existing tubs and surrounds.  Replace existing lavatories with vanity cabinets and tops.

Kitchen work includes removing and replacing existing appliances, kitchen cabinets, countertops, sinks, range hoods, and grease shields.  Install new HPDL wall finish.


Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $150.00  for each set of documents so obtained, made payable to the Housing Authority of the County of Williamson.

This project has a construction estimate of: under $2,500,000.00


PHA Office - 300 Hickory Street, Carterville, IL 62918
Click Here to Access Project Documents
Other project downloads:

Housing Authority of the County of Clark, Illinois - Plumbing and Dwelling Unit Upgrades

Agency: Housing and Urban Development (HUD)

Location: Marshall, Illinois

BASE BID:

IL-69-4/Marshall E & F Type Buildings (Unit 2A/2B & 3A/3B):

Remove and replace existing water/sewer lines, which will require removal of concrete flooring and abatement of floor tile. Remove existing drywall to access plumbing and patch and paint. Remove/reinstall existing kitchen cabinets, install new countertops, laminate on the wall between the upper and lower cabinets and grease shield. New flooring and base trim. Bath upgrades to include new fixtures, accessories, and finishes.

Exterior work consists of replacement of the domestic water and sanitary sewer lines and connecting them to the utility.

BY ALTERNATE BID No. 1:

IL-69-4/Marshall C/1 Type Building (Units 1A/1B):

Remove and replace existing water/sewer lines, which will require removal of concrete flooring and abatement of floor tile.  Remove existing drywall to access plumbing & patch and paint. Remove/reinstall existing kitchen cabinets, install new countertops, laminate on the wall between the upper and lower cabinets & grease shield. New flooring and base trim. Bath upgrades to include new fixtures, accessories, and finishes.

Exterior work consists of replacement of the domestic water and sanitary sewer lines and connecting them to the utility.

BY ALTERNATE BID NO. 2:

IL-69-4/Marshall (C/1 Type Building, Units 4A/4B):

Remove and replace existing water/sewer lines, which will require removal of concrete flooring and abatement of floor tile.  Remove existing drywall to access plumbing & patch and paint. Remove/reinstall existing kitchen cabinets, install new countertops, laminate on the wall between the upper and lower cabinets & grease shield. New flooring and base trim. Bath upgrades to include new fixtures, accessories, and finishes.

Exterior work consists of replacement of the domestic water and sanitary sewer lines and connecting them to the utility.


Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $100.00 for each set of documents so obtained, made payable to the Housing Authority of the County of Clark, Illinois.


PHA Office - 208 Maple Street, Marshall, IL 62441
This project has a construction estimate of: under $258,000.00
Click Here to Access Project Documents
Other project downloads:

Housing Authority of Johnson County - Boiler Replacement

Agency: Housing and Urban Development (HUD)

Location: Vienna, Illinois

BASE BID:

IL-63-2/Vienna and IL-63-3/Vienna:

Replace boilers to Office and existing dwelling units, including pumps, expansion tanks, valves, and thermostats.

BY ALTERNATE BID No. 1:

IL-63-2/Vienna:

Provide new bi-pass, piping zone valves, fin tubes, thermostats, and replace base board covers in second floor spaces.


Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $50.00 for each set of documents so obtained, made payable to the Housing Authority of Johnson County

This project has a construction estimate of: under $220,000

ADDENDUM NO. 1: Issued 2/21/2024

ADDENDUM NO. 2: Issued 2/28/2024


PHA Office - 501 N. 4th St., Vienna, IL 62995
Click Here to Access Project Documents
Other project downloads: