Location: Carbondale, Illinois
Exterior Renovations Include: Replacement of designated low-slope roof areas; coating of existing metal roofing; modifications to existing flashings; and replace designated sections of roof drainage.
Interior Renovations Include: Replacement of existing flooring, including abatement of asbestos flooring, in corridors, classrooms, office, and toilets; replacement of lockers; replacement of toilet partitions; and upgrade attic sprinkler piping.
Replace flooring in classrooms 113, 114, and 115, Art Room 123, and Science Room 128.
Provide custom cabinetry cubbies and cabinet in classrooms 101, 102, 108, 109, and 110.
Perform designated work in Cafeteria 134 and Toilets 07 and 08.
ADDENDUM NO. 1: Issued 3/14/2025
Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $100.00 for each set of documents so obtained, made payable to the Giant City Community Consolidated School District No. 130.
This project has a construction estimate of: under $750,000