Upcoming Projects

Pike County Housing Authority Water Heater Replacement and Site Improvements

Housing and Urban Development (HUD)

Barry, Pleasant Hill, Griggsville, Perry, Baylis, Pittsfield, and New Canton, IL

Work consists of removing and replacing existing water heaters with new 40-gallon water heaters.  This will include adding new expansion tanks and water heater shut-off valves.  Remove and replace dwelling unit main water valve in units wehre water heaters are being replaced.  Perform landscaping at all project sites.  This will include site signate, trees, bushes, shrubs, and other plants.  All plants will be selected from local nurseries.  Replace dwelling unit address plates with new at designated project sites.

White County Housing Authority Furnace Replacement, Phase 2 and Misc. Upgrades

Housing and Urban Development (HUD)

Norris City, IL

IL-68-1/Norris City Site ‘A’

Remove and replacing existing furnaces at elderly dwelling units.  This shall include replacing PVC flue piping, floor grilles, thermostat and wiring, and cleaning the existing under slab ductwork.  Modify existing flue piping.  Install new dryer receptacle, conduit, dryer duct and wall cap and new breaker in existing load center.  Run new conductors to new clothes dryer location.  Install washer box and all plumbing piping and electrical work.  Patch and paint existing gypsum board wall and ceiling finishes affected by plumbing and HVAC work.

IL-68-1/Norris City Site ‘B’

Repair Concrete parking area (remove damage concrete and replace).

IL-68-1/Norris City Site ‘C’

Remove and replace existing concrete parking area and access from Level Street to Unit 601A.  This shall include regrading ditch and installing a new drainage pipe.

IL-68-3/Grayville Site ‘B’

Remove existing concrete walk to Unit 111B and install new walk at higher elevation.

IL-68-4/Norris City

Remove and replacing existing furnaces at elderly dwelling units.  This shall include installing new PVC flue piping, floor grilles, thermostat and wiring.  Modify existing flue piping.  Install new dryer receptacle, conduit, dryer duct and cap, and new breaker in existing load center.  Run new conductors to new clothes dryer location.  Install washer box and all plumbing piping and electrical work.  Patch and paint existing gypsum board wall and ceiling finishes affected by plumbing and HVAC work.

3029 South Park Ave.
P.O. Box 640
Herrin, IL 62948
© 2021 Eggemeyer Associates Architects
crossmenucross-circle