White County Housing Authority - HVAC Upgrades, Phase 2

Agency: Housing and Urban Development (HUD)

Location: Norris City, Crossville and Grayville, Illinois

BASE BID:

IL-68-1/Norris City:

Abate existing floor tile as necessary for infilling the underslab ductwork. Abate existing gypsum board for removal of existing return air grilles and ductwork and create openings in the ceilings for new diffusers and in walls for new return air grilles and ductwork. Remove existing downflow furnace and replace with new upflow furnace, ductwork, and air conditioning. Patch and paint existing gypsum board on walls and ceilings affected by HVAC upgrades. Patch existing floor at infilled ductwork locations. Install new floating vinyl plank flooring over existing flooring. Remove and replace existing vinyl base with new base.

IL-68-2/Crossville:

Add central air conditioning to the existing furnaces.

BY ALTERNATE BID No. 1:

IL-68-3/Grayville:

Abate existing floor tile as necessary for infilling the underslab ductwork. Abate existing gypsum board for removal of existing return air grilles and ductwork and create openings in the ceilings for new diffusers and in walls for new return air grilles and ductwork. Remove existing downflow furnace and replace with new upflow furnace, ductwork, and air conditioning. Patch and paint existing gypsum board on walls and ceilings affected by HVAC upgrades. Patch existing floor at infilled ductwork locations. Install new floating vinyl plank flooring over existing flooring. Remove and replace existing vinyl base with new base.


Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents so obtained, made payable to theWhite County Housing Authority.

This project has a construction estimate of: under $400,000.00


PHA Office - 500 4th St., Crossville, IL 62827